The structural design and documentation for a new 6,500sqm cotton gin in the Northern Territory. The job consisted of a 23m high central processing facility with a 10t gantry crane and 12m high surrounds, and a 3m deep basement.
Key Design Components:
•Waterproofing
•Steel framing and 10T gantry
•Construction methodology to allow foundation and steel framing to be installed prior to basement
•Basement design and waterproofing
•Allowances for heavy equipment